二、 设备标准件 Standard parts of equipment
	1、 感应器:(设备如图一感应器)
	Cylinder: SMC (as shown in pic 1,pic 2 replace the cylinders with SMC)
	
 
	                           图一 pic 1
	2、 电机:(设备如图二)
	Servo motor: Panasonic (The equipment is shown in pic 2 . The motors are updated to Panasonic)
	
 
	                           图二 pic 2
	3、 触摸屏:威纶(设备如图三)
	Touch screen:WEINVIEW(as shown in pic 3, replaced the equipment by WEINVIEW touch screen)
	
 
	                          图三 pic 3 
	4、 PLC:松下(设备如图四)
	PLC:Panasonic (as shown in pic 4, replaced the PLC by Panasonic )
	
 
	                         图四 pic 4
	5、 空气开关:施耐德(设备如图五)
	Air switch: Schneider (replaced the Air switch by Schneider as shown in pic 8)
	
 
	                         图五 pic 5
	三、 设备结构件 Equipment structure
	1 、 滑 动 部 件 H13/HRC55°; Sliding component H13/HRC55°
	2 、 焊 头 :SKD11; Welding head: SKD11
	3、 支撑部件采用:铝合金/喷砂阳极;
	Supporting parts: aluminum alloy/sandblast anode
	4、 其它部分:塑钢/钣金.
	Other parts: plastic steel /sheet metal 
	四、 设备工艺流程 Equipment process flow
	1.设备工艺流程: Equipment process:
	发片→焊接(夹耳带夹爪打开→拉耳带终位→夹爪夹紧→压耳带气缸松开→拉耳带
	初位→旋转下降→双夹爪夹紧→旋转上升→旋转终位→旋转下降→焊接下降焊接→  双夹爪松开→焊接上升→旋转上升→旋转初位)→口罩出料→口罩堆叠流水线
	Material feeding → welding → discharging of masks → stacking assembly line of masks
	2.设 备 图 片 : Equipment picture:
	